Key Takeaways
- Solar installers can reduce compliance paperwork by tracking missing evidence, signatures and approvals around their existing CRM and STC app.
- The Clean Energy Regulator requires completed, signed documents before STC creation, with certificates created within 12 months of installation.
- NSW electricians must submit CCEWs within seven days of completing electrical testing, using BCNSW eCert from 1 July 2026.
- As at 26 October 2026, the NSW CER Installer Portal is scheduled to launch in November 2026, adding a commissioning workflow to prepare for.
- Automation can prepare reminders and exception reports, while accredited installers and licensed electricians retain responsibility for statements, certificates and commissioning records.
I’d start with one job record showing what is missing, who owes it and when it is due. Keep site capture in the existing STC app, then organise the chasing around it. That follows the same approach I recommend for choosing which trade admin to automate first.
What Compliance Paperwork Does a Solar Installation Create?
For a NSW solar job involving STCs, build the checklist around these records, based on official guidance as at 26 October 2026:
- STC assignment form: the system owner signs when assigning the right to create STCs to a registered agent, according to the Clean Energy Regulator’s agent requirements.
- Written compliance statements: installer and designer statements, plus evidence of installer attendance at three installation stages, under the CER’s installer requirements.
- Installation evidence: photos with time, date and site geolocation metadata, and serial-number photos showing the number on the product itself, under the CER’s STC creation requirements.
- Electrical certificate: the NSW Certificate of Compliance for Electrical Work, or CCEW, under NSW electrical compliance requirements.
- Connection and commissioning records: application reference, approval conditions and the applicable commissioning or DER record. Ausgrid’s installer guidance explains its network requirements.
The CER requires all documents completed and signed before STC creation, within 12 months of installation. I’d track that deadline separately from electrical and network deadlines.
What Changes for NSW Solar Installers in 2026?
As at 26 October 2026, BCNSW eCert has been mandatory for CCEWs since 1 July 2026. Submission is due as soon as practical, no later than seven days after electrical testing.
The NSW CER Installer Portal launches in November 2026. NSW guidance says new and upgraded rooftop solar, batteries and their inverters up to 200 kW will use the portal for commissioning, with the CCEW sent automatically to Building Commission NSW. Other electrical work still needs a separate eCert CCEW.
Ausgrid lists 23 November 2026 for portal registration and says new and upgraded NSW solar systems must be backstop-enabled from late 2026. Until the portal goes live, Ausgrid says installations must enter AEMO’s DER Register within 20 days. Confirm your distributor’s transition requirements before changing a checklist.
What Do Formbay and GreenDeal Already Handle?
These apps already cover substantial site capture. I’d check the existing setup before paying for another system.
| Software | Published functions as at 26 October 2026 | What to check in your workflow |
|---|---|---|
| Formbay | Serial scanning, installation photos, customer signatures and installer declarations. | How missing evidence becomes a task against the CRM job. |
| GreenDeal | Job statuses, emailed owner signatures and panel serial checks. | How agent queries and connection progress reach the job record. |
GreenDeal also announced BCNSW eCert integration on 30 June 2026. Check that existing capability before commissioning duplicate entry. My solar CRM and software guide covers the wider software decision.
Which Paperwork Can Be Automated, and Who Must Sign?
I’d automate preparation: identify missing items, match a certificate reference to a job, draft a reminder and flag an approaching deadline. AI can help interpret an agent’s email, but uncertain matches need review.
Keep every outbound message behind approval. The proposed automation must never sign, lodge or declare compliance. Accredited installers and licensed electricians retain their respective signing responsibilities; the CER warns that false or misleading statements attract penalties.
A missing installation-stage photo needs installer review. A later reminder cannot recreate evidence of attendance. For the collection process, see automating client document collection.
How Do You Track Jobs from Connection Application to STC Claim?
- Choose one job identifier. Record the connection reference, customer and site address against it.
- Track separate milestones. Application submitted, approval received, conditions checked, installation completed, CCEW submitted, commissioning recorded and STC claim status.
- Record evidence references. Show which signatures, photos and certificate numbers are present, with a link or manual reference to the source.
- Assign the next action. Give each missing item an owner, due date and prepared reminder for approval.
- Record confirmation. Keep drafted, approved, submitted, queried and completed statuses distinct.
For example, a four-person Sydney installer could replace an admin worker’s morning check of three portals with one exceptions list. Where a portal has no usable connection, the check stays manual and its outcome goes against the job.
What Should a Solar Business Measure?
Measure days from installation to a complete STC pack, claims queried or failed, and jobs past the seven-day CCEW mark. Also show each open connection application’s last confirmed status and next action.
I’d establish the current figures before building. Otherwise, a tidy dashboard can hide the same unfinished work. My guide to what solar installers should automate first covers choosing the starting point.
What Should You Check Before Paying for Automation?
Ask for a walkthrough using one completed job and one stuck job. Check connection access, manual steps, approval gates and how a failed update gets noticed. Price that scope after the walkthrough.
Red flags include promised portal integrations without verification, automatic compliance submissions, invented missing evidence and reminders marked as completed lodgements.
For an Australian solar business that wants a tracking and chasing layer built and then run around its existing CRM and STC app, with a person approving anything compliance-related, Truespeak is built for exactly that.
I’m Sonny Hovsepian, Truespeak’s Sydney-based founder; at Optus, self-service and digital automation I worked on cut operating costs by 40%. Truespeak designs, builds and runs managed automation, including CRM upkeep, document collection and reporting, with monitoring and exception review after launch. Start with a discovery call or see Truespeak’s solar installer page. Related construction work is covered on the home builder page.
This is general information, not compliance or legal advice. Confirm requirements with the CER, Solar Accreditation Australia, Building Commission NSW and your network distributor.
Frequently Asked Questions
How can a small solar installer reduce STC paperwork?
Keep evidence capture in the existing STC app and track missing photos, signatures and agent queries against one job record. Prepare reminders for approval and keep the 12-month STC creation deadline visible.
What paperwork does a NSW solar installer lodge after installation in 2026?
As at 26 October 2026, NSW requires CCEWs through BCNSW eCert within seven days of electrical testing. Network and commissioning records also apply. The NSW CER Installer Portal launches in November 2026, so confirm transition requirements with the distributor.
Can AI track STC claims, CCEWs and grid connection applications?
A proposed tracking system can record references, prepare reminders and flag missing items where usable connections exist. Manual checks remain necessary where systems cannot connect. People approve messages and retain responsibility for compliance submissions.
Can automation sign an installer statement or submit a CCEW?
The workflow described here never signs, submits or declares compliance. Accredited installers and licensed electricians retain their respective responsibilities for statements, certificates and commissioning records.
Does Truespeak replace Formbay or GreenDeal?
No. Truespeak designs, builds and runs the tracking, chasing and reporting layer around the installer’s existing CRM, STC app and government portals. Where a tool has no usable connection, that step stays manual, and a person approves anything compliance-related.
Sources
Checked 25 Oct 2026.
- CER: Registered Agents
- CER: Rooftop Solar Installers and Designers
- CER: Create Small-Scale Technology Certificates
- NSW Government: Electrical Compliance Requirements
- NSW Government: Installer Portal
- Ausgrid: Information for Solar Retailers and Installers
- Formbay: Features
- GreenDeal: Installer App
- GreenDeal: BCNSW eCert Integration Announcement
- Truespeak: Contact